May 6th / 7th 2014
DLR, Rutherfordstrasse 2,
12489 Berlin-Adlershof, Germany
Objectives
-
Confirm payload organization or identify modifications related to M1/M2
-
Identify open aspects for the system design consolidation
-
Preparation of the PLATO kick-off (Phase B) scheduled in July 16/17, 2014
May 7th 2014 (Wednesday) 9:30 – 16:00
10:00 Introduction (Logistics/Agenda)
10:10 PLATO Mission: Status after selection Heike Rauer, DLR
10:30 Payload system
30min
Organization in Germany (PI team, industrial prime, share of work) Gisbert Peter, DLR
11:00 – 11:20 Break
40min
Overall Management & System Engineering Hilda Kinter, KT
Camera Management & System Engineering Alejandro Salado, KT
Assembly, Integration, Verification Management Data
Verification/simulation connected to payload and PDC Conny Aerts, KU Leuven
Data Processing System & pre-AIV (incl. simulators, EGSE) Gisbert Peter, DLR
12:00 – 14:00 Lunch
14:00 P/L camera sub-systems status & work plan
20min
Telescope Optical Unit (TOU) Isabella Pagano & Roberto Ragazzoni, INAF
20min
CCD detector David Walton, MSSL
20min
Normal Front End Electronics (N-FEE) Tom Kennedy, MSSL
20min
Focal Plane Assembly (FPA) Miguel Mas Hesse, CAB-INTA
15:20-16:00 Break
20min
Fast Front End Electronics (F-FEE) Alexander Koncz, DLR
20min
Camera AIV (incl. calibration) Conny Aerts, KU Leuven
17:00 Adjourn
20:00 Dinner
May 7th 2014 (Wednesday) 9:30 – 16:00
9:30
Payload DSP sub-systems status & work plan:
20min
Science Data Algorithms Onboad (DPA) Reza Samadi, LESIA
20min
Main Electronics Unit & Normal Data Processing Unit (MEU & N-DPU) Miguel Mas Hesse, CAB-INTA
20min
Normal Data Processing Unit Software (N-DPU Software) Philippe Plasson, LESIA
10:30 – 11:00 Break
20min
Auxiliary Electronics Unit (AEU) Didier Tiphene, LESIA
20min
Fast Electronics Unit & Software (FEU) Gisbert Peter; DLR
20min
Instrumental Control Unit (ICU) Rosario Cosentino, INAF
12:00 – 14:00 Lunch
14:00
Summary and preparation for Kick-off meeting Heike Rauer, All
15:00 Adjourn